Installation of the LifeAire Systems’ technology is not limited to new construction. The Fertility Center in Grand Rapids, MI completed a comprehensive retrofit installation of a LifeAire system into their existing faciltiy, in only one week’s time.
Click the link below to download the case study:
Manageable Downtime. Significant Results – Retrofit Case Study